High speed railways & Metro railways Project

MPMRCL -Bhopal Metro
05.02.2025
Afcons Infrastructure Limited
Subcontractor for Geotechnical investigation work for part Design and Construction of elevated viaduct, thirteen elevated metro rail station viz. Bhadbhada Chauraha, depot Chauraha, jawahar chowk, Roshanpura Chauraha, Kushabhau Thakre hall, parade ground, prabhat chauraha, govindpura, govindpura industrial area, JK road, indrapuri, piplani and ratnagiri tiraha for Afcons Infrastructure Limited
MPMRCL RVNL
02.12.2024
URC Construction Private Limited
Conducting Pressure meter test and Reporting at Indore Metro Rail project (Package IN04), Indore-Reg for URC Construction Private Limited
National High Speed Rail
19.03.2021
L&TConstruction(NHRCLBulletTrain)
MAHSR-C6 Pkg- Soil Testing for L&TConstruction(NHRCLBulletTrain)
National High Speed Rail
12-02-2022
SCC Infrastructure Private Limited
HSR01-Design and Construction of Civil and Building Worked at Sabarmati for Package No. MAHSR-C8 for SCC Infrastructure Private Limited
HCC
21-01-1900
Tata Projects
Geotechnical Investigation in the stretch of 8.65 km pf project at IN05R package of Indore Metro Projet for HCC tata peojects
Highspeed railway & metro railway
30.06.2025
D.P. Jain & Co Infrastructure Pvt. Ltd.
Span load tests at Nagpur Metro Reach 2A Viaduct of D.P. Jain & Co Infrastructure Pvt. Ltd.